What is a key installer benefit of the voltage protection in SQ/SQE?

Question 2 of 6 Intermediate

Which submersible pump was replaced with a Grundfos SQ?

Question 3 of 6 Intermediate

By how much does the supply voltage decrease before the motor contactor stops the pump?

Question 4 of 6 Intermediate

How many times higher than nominal speed does the motor current reach during the first milliseconds?

Question 5 of 6 Intermediate

Is the SQE pump able to provide constant pressure?

Question 6 of 6 Intermediate

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the 37 - Grundfos SQ/SQE

Achieved badges:

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Continue training Go to MyECADEMY

Sorry. You did not pass the 37 - Grundfos SQ/SQE test this time

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Correct
Q: What is a key installer benefit of the voltage protection in SQ/SQE?
A: Fewer service visits
Correct
Q: Which submersible pump was replaced with a Grundfos SQ?
A: A 4” submersible pump 
Correct
Q: By how much does the supply voltage decrease before the motor contactor stops the pump?
A: More than 10 %
Correct
Q: How many times higher than nominal speed does the motor current reach during the first milliseconds?
A: Seven times higher
Correct
Q: Is the SQE pump able to provide constant pressure?
A: Yes.
Correct
Q: Which protection features does the SQE have?
A: Voltage handling, soft start, dry-running protection and overload protection.