- Grundfos Canada
- Learn
- Ecademy
- All courses
- 9 - Buildings Information M...
- Test your knowledge
Question 1 of 4
Basic
A Grundfos BIM asset is characterised by?
Question 2 of 4
Basic
Can the BIM offerings be chosen to adhere to different regional standards?
Question 3 of 4
Basic
It’s estimated that BIM can encourage time, cost and energy savings of?
Question 4 of 4
Basic
What unnecessary data is usually responsible for a bloated BIM asset?
Question 4 of 4
Basic
Happy with your answers?
Submit your current answers and get the final test result.
Test results
Congratulations. You have passed the test and completed the 9 - Buildings Information Modeling
Sorry. You did not pass the 9 - Buildings Information Modeling test this time
Achieved badges:
How would you rate this course?
1: A Grundfos BIM asset is characterised by?
Photo-realistic rendering of the product
You can find the answer here >
1: A Grundfos BIM asset is characterised by?
Low file size and no specification data
You can find the answer here >
1: A Grundfos BIM asset is characterised by?
Minimal file size without sacrificing specification data
2: Can the BIM offerings be chosen to adhere to different regional standards?
Yes
2: Can the BIM offerings be chosen to adhere to different regional standards?
3: It’s estimated that BIM can encourage time, cost and energy savings of?
Between 15% and 20%
You can find the answer here >
3: It’s estimated that BIM can encourage time, cost and energy savings of?
Between 20% and 30%
3: It’s estimated that BIM can encourage time, cost and energy savings of?
Between 25% and 35%
You can find the answer here >
4: What unnecessary data is usually responsible for a bloated BIM asset?
Data not relevant at any stage of the project lifecycle
You can find the answer here >
4: What unnecessary data is usually responsible for a bloated BIM asset?
Inclusion of unnecessary visual details
You can find the answer here >
4: What unnecessary data is usually responsible for a bloated BIM asset?
The physical appearance of a product