Question 1 of 6
Intermediate

Do you know how much energy in a commercial building is consumed by a HVAC system?

Question 2 of 6
Intermediate

In our example, how much more energy efficient is a hydronic system compared to an air-based VAV system?

Question 3 of 6
Intermediate

Why is limited space for HVAC installations an issue for building projects?

Question 4 of 6
Intermediate

Do Grundfos Modular HVAC systems reduce the HVAC system footprint?

Question 5 of 6
Intermediate

Do building services perform as expected in a typical commercial building project?

Question 6 of 6
Intermediate

Why is installing a Grundfos MIXIT mixing loop solution a good idea?

Question 6 of 6
Intermediate

Happy with your answers?

Submit your current answers and get the final test result.

Test results

Congratulations. You have passed the test and completed the 84 - Adding value in HVAC applications
Sorry. You did not pass the 84 - Adding value in HVAC applications test this time
Achieved badges:
How would you rate this course?
1: Do you know how much energy in a commercial building is consumed by a HVAC system?
1: Do you know how much energy in a commercial building is consumed by a HVAC system?
On average 30-40%
1: Do you know how much energy in a commercial building is consumed by a HVAC system?
2: In our example, how much more energy efficient is a hydronic system compared to an air-based VAV system?
An increase in energy efficiency of 35%
2: In our example, how much more energy efficient is a hydronic system compared to an air-based VAV system?
No real energy savings – but 35% installation cost savings
You can find the answer here >
2: In our example, how much more energy efficient is a hydronic system compared to an air-based VAV system?
The savings depend on water pricing
You can find the answer here >
3: Why is limited space for HVAC installations an issue for building projects?
If too little space is used, you have high operation and service costs; and using too much space reduces the floor area that can be rented out
3: Why is limited space for HVAC installations an issue for building projects?
If the required amount of space is planned for at the design stage, this will not be a problem – as long as it matches the size of the installation
You can find the answer here >
3: Why is limited space for HVAC installations an issue for building projects?
This is an issue that can be resolved by renting out the installation floor area to the service provider
You can find the answer here >
4: Do Grundfos Modular HVAC systems reduce the HVAC system footprint?
No, the benefits come from reducing complexity and time spent on selecting and sizing
You can find the answer here >
4: Do Grundfos Modular HVAC systems reduce the HVAC system footprint?
Yes, but the compact size comes at a high price that the building owner needs to consider in relation to the maximised rentable square meters
You can find the answer here >
4: Do Grundfos Modular HVAC systems reduce the HVAC system footprint?
Yes, benefits come from ensuring maximum profitability of rentable square meters as well as reducing complexity and time spent on selecting and sizing
5: Do building services perform as expected in a typical commercial building project?
No, only 2% of new buildings have a performance that matches the design estimate
5: Do building services perform as expected in a typical commercial building project?
Yes, only 2% of buildings do not perform as they were designed to
You can find the answer here >
5: Do building services perform as expected in a typical commercial building project?
No, but this is expected – adjusting and optimising building services after completion is always calculated into costs
You can find the answer here >
6: Why is installing a Grundfos MIXIT mixing loop solution a good idea?
It can be for some buildings – if price but not efficiency is important
You can find the answer here >
6: Why is installing a Grundfos MIXIT mixing loop solution a good idea?
You get the security of one supplier – but you still need to ensure capability between system components in your installation
You can find the answer here >
6: Why is installing a Grundfos MIXIT mixing loop solution a good idea?
You reduce complexity and time spent on selecting and sizing and MIXIT is up to 25% more cost effective than other solutions